![]() Section 1203.1.3 requires that the installation of standby power systems must be installed in accordance with the Building Code of New York State, NFPA 70 (which is the 2017 National Electrical Code), NFPA 110 (which is the 2016 Standard for Emergency and Standby Power Systems), and NFPA 111 (which is the 2013 Standard on Stored Electrical Energy Emergency and Standby Power Systems). ![]() Starting with the 2020 Fire Code of New York State, Chapter 12, Section 1201.1 states that Chapter 12 of this Code shall apply to the installation operation, maintenance, repair, retrofitting, testing, commissioning and decommissioning of energy systems used for generating or storing energy. This article explores the path through the 2020 Fire Code of New York State, the 2020 Building Code of New York State, their referenced standards, and the conclusion of what the minimum distance should be. Minimum setback distances of permanently installed standby power systems, also referred to as standby generators, from combustible material (siding) has been interpreted differently over the years.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |